  Manufacturing Process Introduction Specification & Application

 

Pay-off Section

The operating principles and functions are similar to the galvanizing process, except that it uses a joiner to fasten the steel sheets together.

 

 

Clean, Pre-treatment and Chemical Coating

The GI strip is cleaned at the degreaser tank, where oil and dust are removed by chemical means. The white rust formed on the surface can be removed at the brush assembly. The clean strip will then be coated with conditioner and chromate at the conditioner and chromate tank respectively, to provide better adhesion and corrosion resistance ability.


 


Prime and Finish Coating

A basic layer of paint, called primer, is applied on the strip in order to strengthen the corrosion resistance and paint adhesion ability. The requested colours and specifications of paint will be applied at both the top and bottom of the primer coated strip to complete the painting work.

 

Prime and Finish Oven

The primer coating is further cured at the primer oven and cooled at the prime water quench to ensure the painted coil is completely cured. Similarly, the finish oven and finish water quench also serve to ensure that the paint applied is completely cured and cooled.

 


Click below to view pre-painted galvanized steel manufacturing process at full size.

Process Flow